Spaljevici

844kW

Installed capacity

3.0GWH/yr

Avg. power production

1.383 Million

Investment

Small Hydro Power Plant – Spaljevici together with sHPP Rmus, were considered as our second and third projects in the catchment of Sekularska river, and after fulfilling legal conditions for construction of these facilities we started realization of these projects at beginning of 2014. As our proven partner that is in charge for all construction works on our projects, Bemax Podgorica started construction of this plant at the beginning of the season in 2014. Hydromechanical equipment was ordered from reputable Austrian company in production of turbines Koessler GMBH as our partner on the projects sHPP Rmus and sHPP Bistrica that were constructed in the same period. GRP materials for penstock construction were purchased from Turkish company Subor Boru as one of our partners that is engaged on all of our projects. Sintaksa Split provided us with Middle voltage facility and control system for this project, and during the operation time of our plants we realized that we made right decision by selection of company that responded to all of our requests and provides us with quick technical support in case of any difficulty.

After construction of sHPP Spaljevici and installation of the equipment for safe power generation from this facility, this plant became operational in December of 2014. sHPP Spaljevici represents specific type of power generation facility that operates independently from the sHPP Rmus that is functioning in the same power house using water potential from different river.

Small Hydro Power Plant – Spaljevici together with sHPP Rmus, were considered as our second and third projects in the catchment of Sekularska river.

Basic technical information – sHPP Spaljevici

Capacity/Production

Installed capacity of the turbine 650 kW
Average power production / yr 2,70 GWh

Hydrology

Upper water level  1115,40 masl
Lower water level  995,00 masl
Average annual water flow 0,567 m3/s
Gross head 120,40 m
Net head 113,00 m

Equipment

Number of turbines 1
Turbine type Pelton
Shaft axis Vertical
Number of jets 5
Installed water flow 0,65 m3/s
Network voltage level 35 kV
Generator type Synchronous
Power factor cosφ 0,9
Frequency 50 Hz

Penstock

Penstock length 1700 m
Pipe material GRP
Penstock diameter Ø700 and Ø800 mm
Pipe nominal pressures PN 16 – PN 20 bar

Water intake

Water intake type Tyrolean (intake in the botom)
Sediment tank length 10,5 m
Sediment tank two chambers
Grain diameter 0,22mm
Fish trail Designed